Bathroom remodeling · Sacramento & Northern California
Bathrooms that feellike a retreat.
Spa-inspired primary baths and refined guest baths — walk-in showers, freestanding tubs, heated floors and tile set floor to ceiling, built on waterproofing done right.

What's included
Built right behind the tile,beautiful in front of it.
Designed with you, priced line by line in one guaranteed-price proposal and built by one team — so nothing falls between trades.
- 01
Walk-in showers
Curbless and low-threshold showers, glass enclosures, niches and benches designed for daily ease.
- 02
Freestanding tubs
Soaking tubs placed and plumbed as the centerpiece of the room.
- 03
Waterproofing
Full waterproofing systems installed and checked before a single tile goes up — the part you never see, done properly.
- 04
Tile, floor to ceiling
Large-format porcelain, natural stone and mosaic, laid out so cuts and lines land where they should.
- 05
Vanities & storage
Double vanities, custom storage and stone tops sized to the room and the way you use it.
- 06
Heated floors, light & air
Radiant floor heat, layered lighting and quiet ventilation for a room that feels good year-round.
Our work · Bathrooms
Down to the studs.Up to a retreat.
This bathroom came out to the framing — then went back together with new waterproofing, large-format tile, a soaking tub and matte black fixtures.


The MAYVOK Standard · In every agreement
See all six promisesPrice guarantee
The price we sign is the price you pay.
One project manager
One person, start to finish.
Written schedule
Dates on paper before work begins.
Written warranty
A 5-year workmanship warranty.
How we work
Calm, clear,start to finish.
On site with our crews — real projects, sped up.
Step 01
Consultation
We meet at your home, listen, measure and talk through ideas, priorities and timing. No pressure, no obligation.
Step 02
Design & proposal
Layout, materials and finishes come together in a clear plan — with a line-by-line proposal and a guaranteed price.
Step 03
Schedule & permits
We lock in dates, order materials early and handle permits, so work starts ready and stays on track.
Step 04
Build
Your project manager runs the site. Photo updates as often as you like, a protected home and a clean finish every day.
Step 05
Walkthrough
We review every detail together, complete the punch list and hand over your written warranty.
Questions
Good questions,straight answers.
How long does a bathroom remodel take?
It depends on the size of the room and the materials you choose. You get a written schedule before we start, and photo updates on your schedule while we build.
Can you turn a tub into a walk-in shower?
Yes — it's one of our most requested changes. We handle the plumbing, drainage, waterproofing and tile so the new shower performs as well as it looks.
What if it's our only bathroom?
We'll plan the sequence with you so you're without a working bathroom for as little time as possible, and walk you through the options before work begins.
How do you prevent leaks?
Every wet area gets a full waterproofing system that is installed and checked before tile. It's the most important step in a bathroom, so we never rush it.
More of what we build
Complimentary design consultation
Let's talk aboutyour home.
Tell us a little about your project. We'll come to you, walk the space and show you what's possible. We take on a limited number of projects each year, so every home gets our full attention.
- 1
We reach out
A real person from our team contacts you the same day to find a time that suits you.
- 2
We visit your home
We listen, measure and talk through ideas, budget comfort and timing.
- 3
You get a clear plan
Design direction and a line-by-line proposal with a guaranteed price — no obligation.
Prefer to talk now?
(916) 917-7580Or text photos of the spacehello@mayvok.comClient references available on request.



